{"id":61061,"date":"2016-10-03T14:29:31","date_gmt":"2016-10-03T14:29:31","guid":{"rendered":"http:\/\/uacrisis.org\/?p=47742"},"modified":"2016-10-04T19:03:28","modified_gmt":"2016-10-04T16:03:28","slug":"47742-stavki-za-1-kvt","status":"publish","type":"post","link":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt","title":{"rendered":"USAID and BRDO experts suggest that Ukraine uses a binary-rate system to calculate connected power capacity"},"content":{"rendered":"<p><a href=\"https:\/\/www.youtube.com\/watch?v=5wgyCP7cxmM\" target=\"_blank\" rel=\"noopener\">WATCH IN ENGLISH<\/a><\/p>\n<p><em>Rates for 1 kW of connected power capacity for consumers connecting to electricity supply networks should be calculated based on real net value of the connection with adjustment on inflation.<\/em><\/p>\n<p><em><strong>Kyiv, Octrober 3, 2016.<\/strong> <\/em>It is necessary that all potential amendments to Article 21 of the draft law 4493 \u201cOn Electric \u00a0Energy Market\u201d be closely monitored by the civil society in order to assure that key provisions ensuring positive effect of the bill remain in the final draft. This is the case of method of calculating rates for 1 kW of connected power, said USAID Leadership in Economic Governance Program, Better Regulation Delivery Office (BRDO) and project organization \u201cPower Grids &amp; Systems\u201d representatives at a press briefing in Ukraine Crisis Media Center. \u00a0\u201cOur warning is that even if this model is accepted, it should be adopted in its initial version, such as it is at present. If adopted, it would put an end to several channels of income, so there are stakeholders who may be negative opinions about it,\u201d said Dmytro Boyarchuk, USAID Leadership in Economic Governance (LEV) Program expert.<\/p>\n<p>The experts explained that in a binary-rate system of connection to electricity supply networks calculation of the connection cost is based on a rate per 1 kW of connected power and a rate per 1 km of power lines. This approach allows defining an exact cost and time needed to carry out connection \u2013 two things of key interest for an investor at the very start of his project. \u201cIn the end, the procedure should be the following: the customer who wants to connect to electricity supply networks goes to the website of an electric energy distributing company, clicks on the map the place where the energy should be supplied and indicates what power he needs. After that, an online-calculator in just some seconds shows him how much it will cost and how much time it will take [\u2026] The cost of 1 meter of power line for any voltage type is clear, the price of 1 kW for any voltage type is clear, so it is easy to make these calculations, there is methodology how to do it\u201d, &#8211; noted Oleg Palayda, director of project organization \u201cPower Grids &amp; Systems\u201d.<\/p>\n<p>According to the experts, the licensees and the National Commission for state regulation of energy and public utilities already consider the possibility of accepting this methodology as a basis. However, there are polemics on how the rates for 1 kW of connected power should be calculated. Civil society experts suggest that calculation should be based on a real net cost of the connection with adjustment on inflation, said Dmytro Boyarchuk. \u201cThe methodology offered by licensees is based on assets value. According to our preliminary calculations, this will be more expensive\u201d, he noted. \u201cAssets value depends directly on replacement cost estimates. It is possible that in the end we will get transparent mechanism of connection, but connection cost will be very high because of high replacement cost estimates\u201d, added Oleksiy Orzhel, BRDO expert.<\/p>\n<p>Experts also propose to ensure the possibility for businesses to receive compensation of costs spent on connection to power grids. \u201cBusinesses have always asked themselves why they should capitalize the \u201coblenergo\u201d [regional energy suppliers] at their own expense to become their customers, if the latter actually earn money on them. If there will be support to the idea of expenses compensation through introducing so-called RAB-tariff for the \u201coblenergo\u201d, this would encourage investors and would boost business development\u201d, explained Mr. Orzhel. \u201cIt is necessary that the customer who connects pays only for himself, for the power that he consumes and for the network component that he uses. If the<br \/>\n\u201coblenergo\u201d wants to build a more powerful substation or power line, it can do it through existing mechanisms, using its own money or through an investment program\u201d, said Mr. Palayda. According to him, RAB-regulation would motivate regional distributing companies to construct power lines with bigger reserve of power that would facilitate connection of new customers when needed. \u201cIf we adopt this methodology, Ukraine will get into top-20 countries according to this parameter of connection to electricity networks,\u201d he added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WATCH IN ENGLISH Rates for 1 kW of connected power capacity for consumers connecting to electricity supply networks should be calculated based on real net value of the connection with adjustment on inflation. Kyiv, Octrober 3, 2016. It is necessary that all potential amendments to Article 21 of the draft law 4493 \u201cOn Electric \u00a0Energy [&hellip;] <a class=\"g1-link g1-link-more\" href=\"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt\">More<\/a><\/p>\n","protected":false},"author":17,"featured_media":61062,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"video","meta":[],"categories":[705],"tags":[],"section":[648],"form":[31956],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>USAID and BRDO experts suggest that Ukraine uses a binary-rate system to calculate connected power capacity | UACRISIS.ORG<\/title>\n<meta name=\"description\" content=\"https:\/\/www.youtube.com\/watch?v=boMFq1Gr9ag WATCH IN ENGLISH Rates for 1 kW of connected power capacity for consumers connecting to electricity supply | Uacrisis.org\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"USAID and BRDO experts suggest that Ukraine uses a binary-rate system to calculate connected power capacity | UACRISIS.ORG\" \/>\n<meta property=\"og:description\" content=\"https:\/\/www.youtube.com\/watch?v=boMFq1Gr9ag WATCH IN ENGLISH Rates for 1 kW of connected power capacity for consumers connecting to electricity supply | Uacrisis.org\" \/>\n<meta property=\"og:url\" content=\"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt\" \/>\n<meta property=\"og:site_name\" content=\"Uacrisis.org\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/uacrisis\/\" \/>\n<meta property=\"article:published_time\" content=\"2016-10-03T14:29:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-10-04T16:03:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/uacrisis.org\/wp-content\/uploads\/2016\/10\/DSC_5288-kopiya.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@uacrisis\" \/>\n<meta name=\"twitter:site\" content=\"@uacrisis\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u041c\u0430\u0440\u0456\u044f \u0404\u043c\u0435\u0446\u044c\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"USAID and BRDO experts suggest that Ukraine uses a binary-rate system to calculate connected power capacity | UACRISIS.ORG","description":"https:\/\/www.youtube.com\/watch?v=boMFq1Gr9ag WATCH IN ENGLISH Rates for 1 kW of connected power capacity for consumers connecting to electricity supply | Uacrisis.org","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt","og_locale":"en_US","og_type":"article","og_title":"USAID and BRDO experts suggest that Ukraine uses a binary-rate system to calculate connected power capacity | UACRISIS.ORG","og_description":"https:\/\/www.youtube.com\/watch?v=boMFq1Gr9ag WATCH IN ENGLISH Rates for 1 kW of connected power capacity for consumers connecting to electricity supply | Uacrisis.org","og_url":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt","og_site_name":"Uacrisis.org","article_publisher":"https:\/\/www.facebook.com\/uacrisis\/","article_published_time":"2016-10-03T14:29:31+00:00","article_modified_time":"2016-10-04T16:03:28+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/uacrisis.org\/wp-content\/uploads\/2016\/10\/DSC_5288-kopiya.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_creator":"@uacrisis","twitter_site":"@uacrisis","twitter_misc":{"Written by":"\u041c\u0430\u0440\u0456\u044f \u0404\u043c\u0435\u0446\u044c","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/uacrisis.org\/uk\/#organization","name":"Ukraine crisis media center","url":"https:\/\/uacrisis.org\/uk\/","sameAs":["https:\/\/www.facebook.com\/uacrisis\/","http:\/\/youtube.com\/UACrisisMediaCenter","https:\/\/twitter.com\/uacrisis"],"logo":{"@type":"ImageObject","@id":"https:\/\/uacrisis.org\/uk\/#logo","inLanguage":"en-US","url":"https:\/\/uacrisis.org\/wp-content\/uploads\/2019\/10\/header_logo-1.png","contentUrl":"https:\/\/uacrisis.org\/wp-content\/uploads\/2019\/10\/header_logo-1.png","width":250,"height":90,"caption":"Ukraine crisis media center"},"image":{"@id":"https:\/\/uacrisis.org\/uk\/#logo"}},{"@type":"WebSite","@id":"https:\/\/uacrisis.org\/uk\/#website","url":"https:\/\/uacrisis.org\/uk\/","name":"Uacrisis.org","description":"Ukraine crisis media center","publisher":{"@id":"https:\/\/uacrisis.org\/uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/uacrisis.org\/uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#primaryimage","inLanguage":"en-US","url":"https:\/\/uacrisis.org\/wp-content\/uploads\/2016\/10\/DSC_5288-kopiya.jpg","contentUrl":"https:\/\/uacrisis.org\/wp-content\/uploads\/2016\/10\/DSC_5288-kopiya.jpg","width":800,"height":533},{"@type":"WebPage","@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#webpage","url":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt","name":"USAID and BRDO experts suggest that Ukraine uses a binary-rate system to calculate connected power capacity | UACRISIS.ORG","isPartOf":{"@id":"https:\/\/uacrisis.org\/uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#primaryimage"},"datePublished":"2016-10-03T14:29:31+00:00","dateModified":"2016-10-04T16:03:28+00:00","description":"https:\/\/www.youtube.com\/watch?v=boMFq1Gr9ag WATCH IN ENGLISH Rates for 1 kW of connected power capacity for consumers connecting to electricity supply | Uacrisis.org","breadcrumb":{"@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/uacrisis.org\/en"},{"@type":"ListItem","position":2,"name":"USAID and BRDO experts suggest that Ukraine uses a binary-rate system to calculate connected power capacity"}]},{"@type":"Article","@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#article","isPartOf":{"@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#webpage"},"author":{"@id":"https:\/\/uacrisis.org\/uk\/#\/schema\/person\/f3f2b1bb1f942ee056df4a1d4f374c4a"},"headline":"USAID and BRDO experts suggest that Ukraine uses a binary-rate system to calculate connected power capacity","datePublished":"2016-10-03T14:29:31+00:00","dateModified":"2016-10-04T16:03:28+00:00","mainEntityOfPage":{"@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#webpage"},"wordCount":705,"commentCount":0,"publisher":{"@id":"https:\/\/uacrisis.org\/uk\/#organization"},"image":{"@id":"https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#primaryimage"},"thumbnailUrl":"https:\/\/uacrisis.org\/wp-content\/uploads\/2016\/10\/DSC_5288-kopiya.jpg","articleSection":["Press release"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/uacrisis.org\/en\/47742-stavki-za-1-kvt#respond"]}]},{"@type":"Person","@id":"https:\/\/uacrisis.org\/uk\/#\/schema\/person\/f3f2b1bb1f942ee056df4a1d4f374c4a","name":"\u041c\u0430\u0440\u0456\u044f \u0404\u043c\u0435\u0446\u044c"}]}},"wps_subtitle":"","amp_enabled":true,"_links":{"self":[{"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/posts\/61061"}],"collection":[{"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/comments?post=61061"}],"version-history":[{"count":0,"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/posts\/61061\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/media\/61062"}],"wp:attachment":[{"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/media?parent=61061"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/categories?post=61061"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/tags?post=61061"},{"taxonomy":"section","embeddable":true,"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/section?post=61061"},{"taxonomy":"form","embeddable":true,"href":"https:\/\/uacrisis.org\/en\/wp-json\/wp\/v2\/form?post=61061"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}