General:
- Total amount of cable: 180 kilometers
- 220 people required to run the live broadcast
Lighting:
- 1816 fixtures
- Consumes 854 000 watt
- 67 000 control channels
- 61 km of cable just for lighting
- Takes 5 main and 5 back up lighting desks to run the show
- 16 followspot operators
- 40 people involved to run lighting during broadcast
Video:
- 1000 sqm of LED Screen
- 71 000 002 pixels resolution
- 12 media servers to handle all video content
- 10 people required to create all content.
- 56 High Output Projectors
- 4 High End MMS systems
Sound:
- 258 speakers
- 825 600 watt output
- 212 microphones
- 18 IEM systems (In ear monitor)
- 152 IEM reciever (In ear monitor)
- 13 sound desks
- 34 people involved to run sound during broadcast
Pyro:
- 48 x flame units
- 50 x firing positions
- 6 x Heavy Fog Outlets
Rigging:
- 212 ton of rigged gear in the roof
- 112 cyberhoist
- 735 rigging points
- 3262 meters of truss
- 42 riggers to get everything up
Power:
- 7 Megawatts at full capacity
- 18 Generators
- 20 000 Liter of fuel used every day
- 38,5 km of high voltage cable
Stage:
- Stage weights 30 tons
- 350 sqm Performance area
- Height 14 meters
- Width 70 meters
- Depth 28 meters
- 8 000 work hours in pre production
- 40 stage techs to handle change overs during broadcast
Broadcast:
- 30 cameras in total- 19 for Show broadcast
- 50 people involved to handle broadcast
- 2 directors
- We are using cuepilot
- 1 x 2d camera and 1 x 1d camera, 3 x Cranes, 2 x dolly tracks
Production:
- 230 trucks of gear
- 100 stage hands for load in, 150 for load out
Grandstands:
- 22 000 pcs of scaff
- It weights 450 tons
- 50 wheelchair seats.